Production Manager: daily workflow
Step-by-step tasks for creating builds, tracking materials, and monitoring progress.
11 يوليو 2026
Each morning: Check open builds
Review progress from the day before and plan the day's work.
- Navigate to Assembly → Builds or Assembly → Production Open in Usystems
- Look at builds with status In Progress or Pending.
- Check material availability: do you have the components needed to keep work flowing?
- Flag any builds at risk of delay (bottlenecks, missing parts, team capacity).
Create a new build (for MTO orders)
When a customer places a new order or you decide to manufacture, create a build.
- Navigate to Assembly → Builds → New Build (or Create Build) Open in Usystems
- Enter the build details:
- Product: Select from your product catalog.
- Quantity: How many units to produce.
- Bill of Materials: The system auto-loads the BOM (recipe) for that product.
- Start date: When should production begin?
- Due date: When does the customer need it (or when should stock be ready)?
- Review the components listed under BOM. If any are out of stock, order them now or adjust the start date.
- Click Save or Start Build.
- The system reserves materials from your گدام (warehouse) and assigns WIP inventory to the build.
Tip: Always verify material availability before starting a build. If a component is backordered, your build will stall.
Record assembly work or material consumption
As your team works, log the components they use and the steps they complete.
- Open the build (from Assembly → Builds).
- Scroll to Assembly Steps or Material Consumption.
- For each task completed:
- Mark the step as Complete with a date/timestamp.
- Log labor hours or the worker's name (if timesheet integration is set up).
- For material used:
- Enter quantities of components pulled from stock.
- The system automatically decreases گدام (warehouse) inventory and increases the build's material cost.
- Click Save.
Receive finished goods into inventory
Once a build is complete, move the finished units to finished-goods inventory.
- Open the build (status should be Ready for Completion or Complete).
- Click Receive into Inventory or Finish Build.
- Confirm the quantity and lot/batch number (if applicable).
- The system:
- Removes the build from WIP.
- Creates finished-goods inventory at the total-cost-per-unit calculated from materials and labor.
- Posts accounting entries (WIP is debited, Finished Goods is credited).
Send finished goods to a customer (MTO)
For orders made to order, ship directly to the customer.
- Open the build or the related sales order.
- Click Fulfill Order or Send to Customer.
- Confirm the shipping address and quantity.
- The system posts a debit to Cost of Goods Sold and a credit to Finished Goods Inventory.
- The sales order is marked complete.
Daily report: Check production status
Before leaving for the day, generate a summary of progress.
- Navigate to Assembly → Reports or Reports → Production Open in Usystems
- Select Production Summary or WIP Status.
- Review:
- Builds completed today.
- Builds still in progress (and estimated completion).
- Material shortages or delays.
- Export as PDF for your records or to share with leadership.
Tips & common mistakes
- Don't start without materials: Confirm stock levels before marking a build as started. Running out mid-production is costly.
- Log work regularly: Update assembly steps and material consumption daily, not at the end of the week. It keeps costs accurate and real-time visibility current.
- Use lot/batch numbers: If your products have expiry dates or serial numbers (e.g., medications, equipment), link them to builds for traceability.
- Review costs weekly: Check the cost-per-unit on in-progress builds. If actual costs are climbing unexpectedly, investigate overages immediately.